RESOURCE PORTFOLIO
Angela Lake
Gold Project
PROJECT FACTS
Project Profile
Early-stage gold targets north of the Birch–Uchi belt
Historic visible-gold boulders, basal-till results and limited drilling guide the search for a nearby bedrock source in the Casummit Lake area
Casummit Lake
Ontario Project Area
Gold
Primary Commodity
GEOLOGY & PROJECT INFORMATION
Technical Overview
Explore the property setting, exploration history and project results.
The project lies near Angela Lake in the Casummit Lake area of the Red Lake Mining Division, at the north end of the Birch–Uchi greenstone belt. The belt also hosts the Springpole gold deposit; a nearby deposit is not evidence of mineralization on the Angela Lake property.
Localized gold was identified in basal till in the 1970s in terrain with limited bedrock exposure. Work in the 1980s identified angular metasedimentary boulders containing thin quartz veinlets and visible gold, with visible-gold particles up to about 0.5 cm across.
Historical drilling encountered rock resembling the boulder host and returned 3.7 g/t gold over 0.3 metres in an interval. These observations define a bedrock-source exploration target but are not a mineral resource.
Argo Gold acquired nine claim units totaling 1.7 square kilometres near Angela Lake at the north end of the Birch Uchi greenstone belt in the Red Lake Mining Division in the Spring of 2018.
Because outcrop is sparse, the geological model relies on historical glacial dispersion, boulder provenance and limited drilling. Mapping, prospecting and till sampling were identified by the company as potential methods for locating mineralized bedrock and refining structural targets.
CORPORATE MILESTONES
Project history
Localized basal-till gold identified
Visible-gold boulders and limited drilling
Claims staked by Argo Gold
